Bids &
Pending Jobs

Carroll Skilled Nursing Facility
Location:
Carroll Hospital | 200 Memorial Ave., Westminster, MD 21157
Description: The scope of work for this project is to construct a two story, sixty (60) bed skilled nursing facility on an approximate 4 acre cleared site on the Carroll Hospital Campus. Building is approximately 46,000 SF, steel and light gauge frame structure. Sitework is by others. This contract does include landscaping. The project has a 15%WMBE goal. Construction anticipated to start October 28, 2019.
Bid Date:
August 29, 2019 | 12:00 PM (ET)
Start Date:
Contact:
Alexandra Donetz | adonetz@ccgmd.com
Wheelhouse 2
Location:
Collective at Canton | Baltimore, MD
Description: Chesapeake Contracting Group invites you to bid on the construction of the Wheelhouse 2, a mixed use retail-multifamily development at the Collective at Canton. The concrete podium with underground wet and dry utilities has already priced, and is NOT included in this final package. The project being priced is building only, no sitework. The building is a 5 story (4 levels of wood frame on 1 level concrete structure) project bearing on shallow foundation. Construction classification is 1A first floor, 5A above. This pricing is based on 100% DD documents. Podium construction is expected to start in September. Wood framing package is by Modutech.
Bid Date:
September 6, 2019 | 2:00 PM (ET)
Start Date:
Contact:
Alexandra Donetz | adonetz@ccgmd.com
REMY Phase II
Location:
7700 Harkins Road | Lanham, Md 20706
Description: Chesapeake Contracting Group (CCG) Residential invites you to bid on Remy Ph 2: Residential Five story, 267,641 SF, 268 Unit, Multi-family project. Project is HUD financed, wage scale included in specifications. Building to achieve LEED Bronze. Local PG County and MBE goals included. Building is wood frame on concrete podium.
Bid Date:
September 12, 2019 | 12:00 PM (ET)
Start Date:
April 2020
Contact:
Alexandra Donetz | adonetz@ccgmd.com